Active Jobs awarded & under Erection (2017)

a.      GR Plaza (10 story), Panama City, Panama. Awarded in July, 2017. This is the second

      MAS Project with TingWall Hidden Frame System.

b.      Town Place Renovation Project, Pittsburgh, PA

       This is the first TingWall Project with MAS.

c.       Taipei Cultural Center, Taipei, Taiwan

     Recently completed jobs(1999-2017)

a.      IBM Renovation Project (from 2000 to 2017) in Rochester, MN completed in April, 2017

       with accumulated total of about 400,000 sq. ft. of TingWall area.

b.      MOP #2 Renovation Project in Pittsburgh, PA completed in 2015 with

       5,600 sq. ft. of TingWall area. This is the first Hidden Frame TingWall

       Project using 3M VHB Tape.

c.       Nan Kang Transit Station Project in Taipei, Taiwan completed in 2015

       with about 500,000 sq. ft. of TingWall area. This is a twin tower 30 story

        high project featuring high-rise TingWall erection without exterior

        access equipment.