Two-story mock-up test for Kossman Development Co.
- for Omega Corporate Center, tested by Farabaugh Engineering and Testing Inc. Turtle Creek, PA, 22 Feb. 1999
o :
 TingWall performance at 6.24 psf: 0.008 cfm/sqft
- < 14% of allowable
o TingWallTM performance at 12 psf :
 0.01 cfm/sqft - Significantly outperformed industry
standards
o :
 Test pressure emulates the effects of high wind
and water volume equivalent to 8 inches per hour
rainfall.
o Test Pressure required :
 20% of positive design wind
load with minimum 6.24psf and
maximum of 12 psf,
 duration 15 minutes.
 (Omega's positive design wind load = 20 psf; 20%
= 4 psf, test uses 6.24 psf)
o TingWallTM performance : NO LEAKAGE
o
o Additional 15 minutes at 20psf,
 which is equivalent to 100 psf design wind load
or 198 mph wind
 (far beyond test requirements)
 - NO LEAKAGE
o Intentional creation of imperfect seals, additional 15 min-utes at 20 psf : NO LEAKAGE
o Repeat tests during 1999 at Farabaugh Engineering and Testing Inc.
o ASTM E330 Structural Load Test
o Test pressure 40psf positive and 40psf negative
 - 3/7, 3/25, 3/31, 4/19, 6/22, 7/1, 7/16, 7/21:
No visual permanent deformations of panel
o Structural Seismic Test :
 side sway = L/100 for three cycles, repeated 3/25,
3/31, 4/19, 6/22, 7/1, 7/16, 7/21:
 No measur-able displacement and no leakage when
water test repeated
o ASTM E331 with intentional cre-ation of imperfect seal
 - 12psf for 15 minutes: 3/7, 3/25, 3/31, 7/1,
7/16, 7/21;
  15.7psf for 15 minutes on 4/19, and 12 psf for
25minutes 6/22. NO LEAKAGE
|