|
|
|
Omega Corporate Center I, Pittsburgh,
PA, USA |
|
|
This project consists
of approximately 80,000 s.f. of our TingWall "65"
Non-Thermally-Broken System and utilizes a horizontal
stud & a vertical mullion support system. The
two "65" systems used are the exposed
frame system with 1" insulated & ¼"
spandrel glass which features an inverted slope
at the main entrance and the hidden frame system
which features aluminum panels up to 26'-0"
long x 3'-8" wide.
|
|
|
|
|
|
Typical Details |
|
|
|
|
|
|
|
|
|
|
Other Projects |
|
|
|
|
|
American Airlines Terminal, Raleigh-Durham International Airport, NC, USA |
|
|
|
|
|
Butler County Airport Terminal, Butler, PA, USA |
|
|
|
|
|
IBM Renovation Project, Rochester, MN, USA |
|
|
|
|
|
E-Park I Office Towers, Taipei, Taiwan |
|
|
|
|
|
E-Park
II Office Towers, Taipei, Taiwan |
|
|
|
|
|
Technology Park Buildings 1 & 2, Portland, OR, USA |
|
|
|
|
|
Nakamura Tower, Nagasaki, Japan |
|
|
|
|
|
SUNY Stony Brook Stadium Press box, Stony Brook, NY, USA |
|
|
|
|
|
|
|
|