|
|
|
IBM Renovation Project Phase 1-4, Rochester, MN, USA |
|
|
This project consists
of a total of approximately 800,000 s.f. which is
broken down into multiple phases and erected over
a number of years. Four phases have been completed
to date with great results. The TingWall "75"
Thermally-Broken System with specially designed
receiver extrusions attached to the existing mullions
to complete our Airloop Principle design. The "75"
System used is the exposed frame system with 1"
insulated glass & exposed frame system with
1/8" composite panels on the exterior and on
the interior which eliminated the need for an interior
finish wall. The design had to keep the original
look of the building, which is shown in the last
picture.
|
|
|
|
|
|
Typical Details |
|
|
|
|
|
|
|
|
|
|
Other Projects |
|
|
|
|
|
Omega
Corporate Center, Pittsburgh, PA, USA |
|
|
|
|
|
American Airlines Terminal, Raleigh-Durham International Airport, NC, USA |
|
|
|
|
|
Butler County Airport Terminal, Butler, PA, USA |
|
|
|
|
|
E-Park I Office Towers, Taipei, Taiwan |
|
|
|
|
|
E-Park
II Office Towers, Taipei, Taiwan |
|
|
|
|
|
Technology Park Buildings 1 & 2, Portland, OR, USA |
|
|
|
|
|
Nakamura Tower, Nagasaki, Japan |
|
|
|
|
|
SUNY Stony Brook Stadium, Stony Brook, NY, USA |
|
|
|
|
|
|
|
|
|
|
|