| Item/Period |
I |
II |
III |
IV |
V |
| 1. Each piece of facing material is unitized as a panel unit. |
* |
* |
* |
* |
* |
| 2. Water repeller in both vertical and horizontal joints. |
* |
*
|
* |
* |
* |
| 3. No exposed silicone caulking. |
* |
* |
* |
* |
* |
| 4. Hidden instantaneous drainage system. |
* |
* |
* |
* |
* |
| 5. Panel securing screws on the interior flange. |
* |
* |
* |
* |
* |
| 6. Non-bonding sealing foam tape used for air seal. |
* |
* |
* |
* |
* |
| 7. Capable of stress free panel drifts in case of story drift. |
* |
* |
* |
* |
* |
| 8. Outer Airloop. |
50% |
* |
* |
* |
* |
| 9. Inner Airloop. |
|
* |
* |
* |
* |
| 10. Water repeller in the vertical joint is a component of the mullion extrusion. |
|
|
* |
* |
* |
| 11. Panel jamb frame being structurally engaged with the mullion. |
|
|
* |
* |
* |
| 12. Non-directional erection. |
|
|
* |
* |
* |
| 13. Water seals in panel joints. |
|
|
|
* |
* |
| 14. Anchoring clip for exterior attachments without wall penetration. |
|
|
|
* |
* |
| 15. Limit curtain wall joint movement to 1/4กจ while allowing3/4กจ floor deflection. |
|
|
|
* |
* |
| 16. Three way adjustable mullion connection without field welding. |
|
|
|
* |
* |
| 17. Panel securing screw in pressure equalized zone. |
|
|
|
* |
* |
| 18. Adding wipe gaskets to water repellers in the vertical and horizontal joints. |
|
|
|
|
* |
| 19. Completed and being erected TingWall projects. (Sq. M) |
40,000 |
200 |
8,000 |
60,000 |
4,000 |
| 20. To be erected and technically qualified TingWall projects.(Sq. M) |
0 |
0 |
0 |
60,000 |
540,000 |